Leading by Example
We have successfully completed countless large-scale projects throughout the province of Ontario and abroad, while utilizing proprietary solutions customized to the requirements of each site.
Sandalwood Park
October 2020
15,600 M3
Storage Volume
12,900 M2
System Area
Location:
Type:
Engineer:
Materials:
The City of Mississauga
Infiltration System
Resilient Consulting
Cultec Recharger 902HD
Habitat for Humanity
November 2020
70 M3
Storage Volume
192 M2
System Area
1 M
Buried Depth
Location:
Type:
Engineer:
Materials:
The Town of Georgina
Retention System
Crozier and Associates
GreenStorm ST Half Block, Oil Grit Separator
Bond Crescent
December 2020
250 M3
Storage Volume
1,570 M2
System Area
Location:
Type:
Engineer:
Materials:
The Town of Richmond Hill
Retention System
Cole Engineering
Cultec Contractor 100HD, Oil Grit Separator
Shining Hill Estates Phase 3
May 2023
1503m M3
Storage Volume
790m M2
System Area
Location:
Type:
Engineer:
Materials:
Town of Aurora (Municipally Approved)
Detention System
SCS
GreenStorm ST